Week 19 started slow, but by the end, there was some major progress. We are at the point where everything is pretty much a waiting game-waiting for the floors to be done, waiting for the shower and tub to be installed, waiting for the cabinets to be in. Here’s what happened in the 19th week of house construction.
At the beginning of the week, they did the exterior door knobs. They also did the front door, but I forgot to take a picture of it!
They also did the interior door knobs. Aren’t they pretty? 🙂
By mid week, they started hanging a few of the light fixtures
And then they got the heating/cooling system working! Just in time for the hardwood to be delivered. I was worried this would cause a delay because the hardwood has to sit and acclimate in the space.
While I was at the house on Wednesday afternoon, the shower guy stopped by with samples for the shower and tub. I’m doing a marble shower and tub and I had to pick out which I wanted. I went with this one called “pearl black”
And then on Friday, the flooring was delivered!
They started working on it on Saturday and I love it! I am so happy with the decision I went with on the floors. 🙂 🙂
To see more of my house construction process, check out these posts: